Skip to main content

This is a new service. Help us improve it and give your feedback.

QAT Standards

Test Exit Report Template

UKHSA QAT_Test Exit Report Template (Replace with Initiative Name)

Project Name: Project Title

1. Document Control & References

Version Date Author Change Description Approved By
0.1 YYYY-MM-DD Author Name Initial draft
0.2 YYYY-MM-DD Author Name Revised draft with updates based on review feedback
1.0 YYYY-MM-DD Author Name Final version for release Approver Name
1.1 YYYY-MM-DD Author Name Minor updates or clarifications Approver Name, if needed
Reference Number Reference Document Name Version
1 e.g., Test Plan v1.0
2 e.g., Test Strategy
3 e.g., Automation Test Plan
4 e.g., Performance Test Plan

2. Document Purpose

This document provides a summary of the testing activities conducted for the Project Name. It includes results, defect analysis, test coverage, and overall quality assessment, validating whether the software meets its acceptance criteria as defined in the Test Plan.

3. Scope

3.1 In Scope

This document details the Testing Scope, (as defined on Test Plan or any deviations from Test Plan to be in detailed) testing results for the tests that were performed against (Release name and Version)

This report covers the following levels of testing and provides Test Summary, Overview of testing & test results (Functional Testing including Automation and Non -Functional Test results ), Open defects & observations.

(Amend the scope as per your requirement)

  • Unit Testing
  • Integration Testing
  • System Testing
  • User Acceptance Testing (UAT)
  • Performance Testing
  • Operational Acceptance Testing (OAT)

3.2 Out Of Scope

(As defined on Test Plan or any deviations from Test Plan to be in detailed)

Anything out of Scope as mentioned in Test Plan.

eg: Pen Testing/security testing.

4. Test Summary

5. Test Results Summary

Update the below sections as per your requirement

5.1 Unit Testing

Test Area Total Tests Total Executed Passed Failed % Executed vs total tests % Passed vs executed % Passed vs total tests

5.2 Integration Testing

Test Area Total Tests Total Executed Passed Failed % Executed vs total tests % Passed vs executed % Passed vs total tests

5.3 System Testing

Test Area Total Tests Total Executed Passed Failed % Executed vs total tests % Passed vs executed % Passed vs total tests

5.4 User Acceptance Testing (UAT)

Test Area Total Tests Total Executed Passed Failed % Executed vs total tests % Passed vs executed % Passed vs total tests

5.5 Automation Test Summary

Test Area Total Tests Total Executed Passed Failed % Executed vs total tests % Passed vs executed % Passed vs total tests

5.6 Performance Test Summary

Test Area Total Tests Total Executed Passed Failed % Executed vs total tests % Passed vs executed % Passed vs total tests

5.7 Accessibility Test Summary

6. Defect Summary

Followed UKHSA approved Defect Management Process

Defect Management and Resolution - DevOps Standards.

Provide Defect Summary on Severity Basis

Severity Reported Closed Deferred Outstanding
1 – Critical X X X X
2 – High X X X X
3 – Medium X X X X
4 – Low X X X X

7. Test Coverage

  • Requirements Covered: eg:, 95% of - Functional Requirements are covered
  • Traceability Matrix: Attached / Link Provided

8. Risks and Mitigations

This section outlines key risks identified during the testing phase that may impact the quality, timeline, or stability of the release along with its Mitigation Strategy.

Risk Description Impact Mitigation Strategy Risk Owner
Example: UAT delays High Parallel system testing to catch up
Example: Environment issues Medium Added buffer for re-testing

9. Exit Criteria Evaluation

As Detailed in Test Plan. Any deviation should be detailed in section 10

Ref Exit Criteria Complete
1 All planned test cases executed, and pass percentage is >= 95% Yes
2 All severity 1 or 2 defects are fixed, retested and closed. Yes
3 All Severity 1 or 2 defects have been logged, agreed in testing, resolved with the solution documented, and successfully re-tested. Yes
4 All open Severity 3 and 4 defects will be reviewed with the business and, if Critical for go-live, defects should be fixed, retested, and closed. Deferred defects must have Project Manager/Product Owner approval and a documented closure plan. Yes
5 Test Completion Report including test results and list of open defects approved by QAT Test Assurance Manager and Project Manager and shared with key stakeholders. Yes

10. Outstanding Issues/Deviations

Impact has been added to the outstanding issues in the tables below. The Impact values are defined as follows:

High Impact - Will result in the same defect in Production

Low Impact - workaround available and Go live or into next phase of Test

No Impact - It’s absence will not result in issues in Production or next test phase.

10.1 Outstanding Defects

Any Open Defects should be detailed here along with a Justification to say Go or No-Go and impacts

Defect Id Description Severity Impact (High/Low/No) Owner Plan of Action

10.2 Test exit criteria not met

Any Deviations from the Original Test Plan should be detailed here along with a Justification and impacts

Criteria not met Justification Action Planned for Resolution Impact Owner Release/Due Date

10.3 Planned tests not run

Any Deviations from the Original Test Plan should be detailed here along with a Justification and impacts

Test not run Rationale Action Planned for Resolution Impact Owner Release

10.4 Tests not passed

Any Deviations from the Original Test Plan should be detailed here along with a Justification and impacts

Test not passed Rationale/Justification Action Planned for Resolution Impact Owner Release

11. Lessons Learned

  • Brief notes on what went well, what can be improved.

Lessons Learned – Summary

Category What Went Well (Keep Doing) What Didn’t Go Well (Improve/Stop Doing) Category Recommendations / Actions Owner Status
Scope and Planning
Requirements
Testing
Communication
Risks / Assumptions / Dependencies

12. Recommendations

  • Proceed to deployment / regression testing / next phase.
  • Areas needing improvement in future test cycles.

13. Approval

Name Role Signature Date
Test Manager Test Lead
Project Manager Project Lead
Client Rep UAT Approver

Published: 27 February 2026
Last updated: 17 March 2026
Page Source