UKHSA Functional Test Plan Template

<Project/Initiative Name>


Test Plan Identifier Here

Guidance Notes:
Assign a unique identifier to this test plan for reference and tracking purposes.

Example:
XXXX-FTP-NN, EDAP-FTP-01


Document Details

Document version: <insert version number e.g., 0.1>
Last updated date:
Author: <insert author’s name>
Status: <insert status e.g., Draft or Approved>
Date approved:

Dcoument Info

Version History

Version Date Author (A), Contributor © Notes
V0.1 07/02/2025

Document Approval

Name Role Date Approved Comments
Project Manager
Test Manager
QAT Manager

Document Distribution

Name Role Version Comments
Programme Manager
Delivery Manager
Scrum Master
Solution Architect
Product Owner
Business Analyst

Document Location

Location Link
Confluence
SharePoint

reference Documents

Number Name Location Notes

1. Introduction

1.1 Project Background

Guidance:
Provide a high-level summary of the project, including a brief overview of the project background, business objectives, and timelines (if available).
Describe the project benefits and intended outcomes.
Include references where appropriate (e.g., SOW, Business Requirements, etc.).


1.2 Purpose of the Document

Guidance:

  • Clarify the scope of system testing (e.g., functional integration, E2E), including areas not covered, to ensure the test coverage is clearly understood.
  • Ensure test staffing, responsibilities, and timelines are defined, understood, and agreed upon by all responsible parties.
  • Specify the tools, environments, and data required for test execution.
  • Specify detailed Test Entry Criteria (required to begin functional testing) and Test Exit Criteria (required for completion of functional testing).
  • Highlight key risks and dependencies related to resources, quality, delivery, and timelines.

The primary purpose of this document is to define the test scope and coverage, testing schedule, activities, resources, and environment required for the system test activities for <project name / initiative name>.


1.3 Intended Audience

Guidance:
Identify the main teams or individuals who rely on the test plan and must be informed of its contents, scope, and objectives.
Examples include: Development, DevOps, Testing, Business Analysts, Scrum Masters, Solution Architects, UI Designers, etc.

The intended audience for this document includes:

  • Dev and Test Team members
  • QAT Team
  • Project approvers and stakeholders
  • Managers involved in deliverables and resource provision
  • Individuals with responsibilities defined in this document
  • Support teams requiring familiarisation with the project

2.0 Test Scope

Guidance:
Describe the features and functionalities to be tested, and specify what is out of scope for this execution.

2.1 In scope

Guidance:
Describe all features and requirements to be covered in functional testing.
If Jira is used for test planning, insert a Jira filter listing all Epics, User Stories, and Functional/Non-Functional Requirements included in this test plan.

2.2 Out of scope

Guidance:
Describe all functional and non-functional requirements and any project-specific items that are not included in the testing activities.


3.0 Test Approach

Guidance:
Define the functional testing approach and methodology (e.g., Agile), based on the application and solution.
Specify the intended coverage of manual versus automated testing, and list the test types to be executed (e.g., positive, negative, boundary, workflow).
Include references to standard tools for test planning and management (e.g., Jira, Xray). Describe the key steps in the approach.

Process Activities
1. Planning - Analysis of requirement and Test Scenarios development.
- Review test resources and requirements.
- Review of test plan and test documentation tools.
- Review Test Environment requirements and readiness criteria.
- Plan and setup Test data types, sources and test data.
- Smoke testing, Regression testing, Defect triage.
- Test plan review and approval by the project stakeholders and QAT team.
2. Designing - Define test scenarios and create test cases, aligned, updated in Jira and mapped to the requirements.
- Update and refine test cases as per plan prior to the formal test execution.
- Identify a set of regression test cases to be run after defect fixes or changes are introduced.
3. Execution - Review the Test Entry Criteria.
- Initiate test execution as per the agreed schedule.
- Publish interim progress in case of blockers during execution.
- Record and update Test Results, Jira & other tracking tools (e.g., MS Excel).
- Ensure defect management triage calls based on the agreed process are in place.
- Record and manage issues and defects (Jira).
4. Progress Reporting - Publish interim update in case of blockers during execution.
- Publish Daily Status reports.
5. Defect Triage - Based on the Defect Management Process, triage meetings are conducted.
6. Completion - A formal test phase exit with an approved Functional Test Completion Report.

4.0 Requirement Traceability Matrix (RTM)

Guidance:
Developing a Requirement Traceability Matrix (RTM) is a key test planning activity that ensures each requirement is covered by at least one or more test cases.
The RTM validates that requirements are linked to corresponding test cases, ensuring that each requirement is functionally tested.
RTM helps with test coverage review, ensuring each requirement is adequately validated and not overlooked.
QAT and QA teams can identify gaps in test coverage and make adjustments as needed to fully confirm functional testing readiness.
RTM also helps define the test execution schedule for optimal results.

Below is an example RTM table (typically maintained in Excel):

Requirement Traceability Matrix

Requirement ID Test Case ID Test Case Summary Priority Status
REQ-001 ET-010 M Completed
REQ-002 ET-100 H In Review
REQ-003 ET-150 M In Progress

This Agile‑specific RTM helps teams ensure that every User Story is adequately tested and allows for a transparent, iterative approach to testing in Agile.
It is an essential tool for tracking testing progress, ensuring requirements have been met, and identifying any gaps in test coverage.

EPIC User Story Test Case ID Test Case Summary Requirement ID Priority Status
ET-010 ET-0100 ET-010 REQ-001 H Completed
ET-010 ET-0100 ET-020 REQ-004 M In Review
ET-010 ET-0100 ET-030 REQ-005 H In Progress
ET-011 ET-0125 ET-100 REQ-002 M In Progress
ET-012 ET-0125 ET-150 REQ-003 L In Review
ET-012 ET-0125 ET-200 REQ-006 M In Progress

5.0 Test Schedule

Guidance: Provide a detailed timeline (as much as possible at the time of writing) outlining the testing activities, including start and end dates for the functional test phase.

Project Implementation Schedule or Sprint Plan on a page showing a dedicated schedule for testing activities is available as below:

  • <insert LINK: Project Plan/schedule>
  • <insert link: test schedule>

6.0 Test Environment and Tools

6.1 Test Environment

Guidance:
A Functional Test Environment is a configuration‑managed setup that includes the required software, resources, infrastructure, and support services as defined in the solution design documents.

Its primary purpose is to closely replicate the real deployment environment, ensuring that the system or component functions as expected according to the functional requirements.

This environment helps validate that the system meets the acceptance criteria before progressing to subsequent testing phases such as system integration testing or performance testing.

Use the following table to describe the test environment(s) to be used for functional testing:

Functional Test Environments

Test Environment Purpose / Scope Link / URL Notes
Dev & Test
Functional
UAT

6.2 Testing Tools

Guidance:
Provide details on the number and type of tools to be used for the test phase, defect and test management activities.
For example, Jira and Xray are used for test planning and execution.

Tools Overview

# Tool Purpose Notes
1 Jira Test cases development, Defect Management, Jira Boards
2 Xray Test Management, Execution and Traceability, Test Reporting
3 Other tools (e.g., screen grab or recording tool)

6.3 Test Data Requirements (Optional)

Guidance: Define the data required for testing, including any test data sources and how the data will be prepared.


7.0 Defect Management

Guidance: Explain the defect lifecycle, including how defects will be managed, recorded, reported, and triaged with agreed definitions of severity and priority.

Workflow Diagram

Formal defect tracking will occur throughout the test execution phase. Jira will be used to track and manage defects. Defects will be raised when a test case fails and will be linked to the test case or a defect can be raised which is not linked to a test case (ad-hoc defects) generally found during ad-hoc testing.

All defects identified will be recorded within the defect management tool. The Test Manager will ensure defects raised are investigated, and prioritized and plans put in place for their resolution. Defect triage meetings will be planned regularly based on agreed timelines which will look at all defects raised during the time period and decide the validity as well as priority and severity of the defects. It will be chaired by the Test Manager/Defect manager and attended by Project, Development, Product and Infrastructure Teams.

Root Cause will be captured mandatorily at the time of defect closure.

7.1 Defect Priority

The Priority of the defect relates to the impact the issue has on testing and the Priority may change as the initiative approaches Go-Live. The Priority may be initially set by the Test Lead or Test Manager and will be reviewed at a project level. Priority is set independent and separate from Severity.

Below are the guidelines that will be used to decide the Priority of the defects identified during testing:

Priorities Description / Impact to Testing if Not Fixed Target Fix Required
Critical (P1) - All testing stopped
- Unable to execute any test cases
- System or test environment required for testing unavailable
- Critical test cases must be executed before Go‑Live
- Example: Test environment not available or users unable to login
Immediate – Within 24 hours
High (P2) - Significant volume / high proportion of testing stopped / blocked
- Able to continue with some testing
- Tests blocked relate to core functionality
- Example: Notification process working but charge or update function not working
Fixed delivered in current sprint window
Medium (P3) - Group of tests stopped or blocked from execution
- Tests relate to non‑core functions or back‑end processing (e.g., batch processing)
- Example: Single screen not working or available
Fixed delivery in next sprint
Low (P4) - Stops or blocks handful of non‑core test cases from being executed
- Tests relate to very infrequently used or very low‑priority user functionality
- Example: Cosmetic issues relating to spelling on screen or documentation
Fix delivery optional

7.2 Defect Severity

The Severity of an issue is the measure of the impact the issue would have to UKHSA users or the UKHSA organisation, if the code was in a Production environment.
The Severity of the defect does not change during the delivery of the initiative. Severity is set independent and separate from Priority.

Below are the guidelines that will be used to decide the Severity of the defects identified during testing:

Severities Description / Impact on UKHSA users or the UKHSA Organization If Not Fixed Fix Required By
Critical (S1) - Breaches Legal, Regulatory or Compliance requirements
- Results in damage to UKHSA reputation or image
- Results in poor / degraded user service and generates complaints
- Results in Financial loss or legal actions
- Results in Data production leakage
- Unable to produce mandatory, statutory reports or produces inaccurate management information
- No Workaround to defect
Must Be Fixed Before Go-Live
High (S2) - Does not result in Severity 1 outcomes
- UKHSA processes or user activity will not occur for a significant period after Go‑Live i.e. Yearly reporting
- User service can be managed by a sustainable workaround
- UKHSA reporting accuracy and continuity can be maintained at a reasonable cost
- Workaround is sustainable in the short term for the UKHSA organization
Fix expected shortly after Go‑Live or before UKHSA required business event occurs
Medium (P3) - Does not result in Severity 1 or 2 outcomes
- Requires only moderate adjustment to UKHSA users or organization processing
- Workaround sustainable in the long term without significant increase in costs
- Workaround is sustainable in the long term to the UKHSA organization
Fix can be permitted when the area of the code is being changed
Low (S4) - Does not result in Severity 1, 2 or 3 outcomes
- Cosmetic issue relating to screens, printing or documentation
- Very minor changes required to UKHSA processing without any additional costs
- No workaround required. Service levels can be maintained
No Fix Required

8.0 Test Quality Gate Criteria

Guidance: This section covers the entry and exit criteria for the testing execution. Entry criteria are clear statements of requirements that must be satisfied before the functional testing can commence, and exit criteria indicate what must be satisfied before this test stage can be completed.

8.1 Entry Criteria

  • Functional System Test Plan (this document) to be reviewed and signed off by the Project Manager, QAT Test Assurance Manager etc.
  • Successful unit testing of features or components to be tested.
  • Test Environments are stable and available for test execution.
  • Support Teams available (as necessary)
  • Test cases are created, signed off, uploaded to Jira Project and mapped to project requirements (for traceability).
  • Test data setup completed (if needed)
  • Test resources available to support test execution.
  • Successful completion of Smoke testing before formal test execution can commence.

8.2 Exit Criteria

  • All planned test cases executed, and pass percentage is >= 95%
  • All Severity 1 or Severity 2 defects are fixed, retested and closed.
  • Severity 3 and Severity 4 open defects to be agreed with the business and if required for go-live to be fixed, retested and closed. Any outstanding defects that are agreed to deferred (not to be fixed in the functional test phase) documented with Project Manager/Product Owner approvals and with a plan in place for the defect closure.
  • Test Completion Report including test results and list of open defects approved by QAT Test Assurance Manager and Project Manager and shared with key stakeholders.

9.0 Project (or Test) Team Role and Responsibilities:

Guidance: The Project or Test Team Resources table can be used for the current test phase, outlining the team members’ roles, responsibilities, and resource allocation:

As an example, the key team members involved in the delivery of the testing activities are detailed as below (change and update based on the team structure and requirements):

Role Team Member Responsibilities Time Commitment
Project Manager - Oversee project progress
- Manage stakeholder communication
- Risk management
- Resource allocation
<insert e.g., full time, 2 days>
Test Manager - Lead the testing team
- Develop test strategy and plans
- Manage test execution and defect tracking
<insert e.g., full time, 2 days>
Test Lead / Tester(s) - Design and execute test cases
- Report and track defects
- Verify test results and create test execution reports
<insert e.g., full time, 2 days>
QAT Manager - Assurance of the test deliverables
- Review and approve test documents
- Issue Assurance Test Report
<insert e.g., full time, 2 days>

10.0 RACI Matrix (optional)

The RACI matrix (example) below (where R = Responsible, A = Accountable, C = Consulted, I = Informed) indicates the key activities/responsibilities relating to the testing of capabilities delivered in the project:

Deliverable Test Manager Test Lead Dev Team Project Manager
Functional Test Plan R C C C
Test Schedule A R C I
Defect Review I R C I
Reporting I I I I
Test Exit Report R I I I

11.0 Test RAID Log

Keys:

RAID:
R = Risk, A = Assumption, I = Issue, D = Dependency

Impact / Probability Levels:
H = High, M = Medium, L = Low


Guidance:
It is recommended to organise RAID review meetings as part of test planning. High-level definitions for RAID are stated below:

  • Risk: A potential event or situation that could negatively impact the testing, if they occur. For example risks can be originate from (lack of requirement, test environment issues, resource availability and clearance requirement, test gaps, defect leakage etc.)
  • Assumption: A assumption is a factor considered to be true for planning purposes, though it may not be verified or guaranteed.
  • Issue: An issue is problem or obstacle that has already occurred and needs immediate attention to avoid delays or failure in testing.
  • Dependency: A dependencies refers to external or internal factors that affects the testing timeline, resources, or activities, and which must be managed to ensure successful testing start or completion.

ID R/A/I/D Description Impact Probability Mitigation Owner Status

Note: All RAID items must be documented and regularly reviewed in the project’s RAID log.

12.0 Glossary of Terms

Term Definition
1. Defect A deviation from the expected behaviour or requirement.
2. QAT Quality Assurance and Test
3. UKHSA UK Health Security Agency
4. RTM Requirement Traceability Matrix
5. Test Environment A test environment is a setup of software and hardware (physical and/or cloud‑based) for the testing teams to execute test cases. It includes the necessary components that support test execution configured based on the solution architecture/design. It is common to create and maintain dedicated and multiple test environments e.g., for Performance and UAT as per the objectives of testing.
6. RAID Risks, Assumptions, Issues and Dependencies
7. Smoke Testing It is a brief and specific preliminary testing process designed to verify the basic functionality of a system or application. The goal is to quickly identify any critical issues or showstoppers that would prevent further testing.
8. UAT User Acceptance Testing
9. A11Y Accessibility Testing
10. UI User Interface (i.e., web page, Application’s window, dialogue box etc.)